17” x 7”, 3/8" thick steel cutout of Violin design client has agreed to with base. Finish will be matte black 1200 degree temp paint.
For the base: add 2 inches to the bottom of the samurai's feet (depth of glass beads)and extend out 2 inches in each direction (4” to fit between the pipes to sit on the bottom of the hearth so it would not have to be attached - it would be self supporting
Project total: $2,300.00, plus sales tax. Fabrication and finish are included. Shipping and handling will be an additional $200.00.
Total cost: $2,300.00 + $200.00 Shipping = $2,500.00 plus 6% MD Sales tax (applied at checkout)
Timeframe: 8 to 10 weeks from paid deposit.
50% initial payment due before fabrication
50% due prior to shipment
($1,250x 2)= $2,500.00 + 6% MD sales tax = $2,650.00
An additional $400 is applied to final charge of $1,250.00 for design modification on April 23rd
Total Cost Final Deposit: $1,250.00 + $400.00 = $1,650.00
If you'd like to proceed: We will proceed with the shipment process after the 50% payment has been made.
17” x 7”, 3/8" thick steel cutout of Violin design client has agreed to with base. Finish will be matte black 1200 degree temp paint.
For the base: add 2 inches to the bottom of the samurai's feet (depth of glass beads)and extend out 2 inches in each direction (4” to fit between the pipes to sit on the bottom of the hearth so it would not have to be attached - it would be self supporting
Project total: $2,300.00, plus sales tax. Fabrication and finish are included. Shipping and handling will be an additional $200.00.
Total cost: $2,300.00 + $200.00 Shipping = $2,500.00 plus 6% MD Sales tax (applied at checkout)
Timeframe: 8 to 10 weeks from paid deposit.
50% initial payment due before fabrication
50% due prior to shipment
($1,250x 2)= $2,500.00 + 6% MD sales tax = $2,650.00
An additional $400 is applied to final charge of $1,250.00 for design modification on April 23rd
Total Cost Final Deposit: $1,250.00 + $400.00 = $1,650.00
If you'd like to proceed: We will proceed with the shipment process after the 50% payment has been made.